Our projects

Sakra H2-Ready Cogeneration Plant

A landmark project in Singapore’s shift toward sustainable energy, ZYS provided critical engineering support for the Sakra sector’s first hydrogen-ready combined-cycle gas turbine plant. Our team managed the intricate installation of high-pressure piping and structural steel frameworks designed to support 30% hydrogen-blended fuel operations, contributing to a cleaner energy grid for Jurong Island’s industrial consumers.

building surrounded with trees beside mountain
building surrounded with trees beside mountain
Tuas Next-Gen Terminal (Phase 3) Infrastructure

Working within the world’s largest automated port development, ZYS executed large-scale civil works for the Phase 3 expansion. This project involved extensive site preparation, the construction of reinforced stacking yards, and the installation of specialized subterranean drainage systems. Our focus remained on high-load durability and precision alignment to accommodate future automated guided vehicle (AGV) operations.

gang chairs inside airport
gang chairs inside airport
Jurong Island Petrochemical Integrated Hub

ZYS led the construction of a specialized integrated utility hub for a major petrochemical refinery. The project required the seamless integration of modular process units, fire-rated structural enclosures, and complex electrical instrument buildings. All works were completed under strict "Live Plant" conditions, maintaining a zero-accident safety record while adhering to the highest global petrochemical safety standards.